Essentials of
Plumbing

shpslogo.jpg (6992 bytes)

INSTALLING WALL-HUNG URINALS

To install a wall-hung urinal, you need a mounting board to place between the wall studs for support and the manufacturer’s rough-in specifications for the urinal. The rough-in specifications determine the height from the floor to install the mounting board between the studs. The mounting board is installed before the studs are covered with a finished wall (see Figure 37).

FIGURE 37.  MANUFACTURER'S SPECIFICATIONS
FIGURE 37. MANUFACTURER'S SPECIFICATIONS

 

A wall-hung urinal is fastened with screws or bolts to a mounting board behind the finished wall. Make sure the urinal is set in a level position (see Figure 38).

FIGURE 38.  ATTACHING WALL-HUNG URINAL TO WALL
FIGURE 38. ATTACHING WALL-HUNG URINAL TO WALL


Primary Content Provider: U.S. Army
Publisher: SweetHaven Publishing Services

Copyright © 2005, SweetHaven Publishing Services
All rights reserved